PROJECT NAME:  BELFIUS FIT-OUT

KEY INFORMATION

AREA :
PROJECT DURATION :
ARCHITECT :
PM / QUANTITY SURVEYOR :
M & E CONSULTANT :
MECHANICAL :
ELECTRICAL :
CIVIL STRUCTURAL :

10,000 sqft
1 MONTH
DEREK P. HEGARTY
HEALY KELLY TURNER TOWNSEND
L. LYNCH LTD
CJK ENGINEERING
CRA Ltd.
ADCO Contracting

PROJECT DESCRIPTION

ADCO were contracted to complete alteration works on Belfius Bank’s ground floor office. Works included complete office fit-outs to the ground floor, installation of a new kitchen, as well as the design and construction of a wet room in accordance with new Building Regs 2010.

Challenges Faced
- Verification testing had to be completed to all M&E services and a detailed dilapidation report prepared prior to commencing works on site.
- The building was occupied by existing tenants, which meant specific invasive activities had to be coordinated out of hours within an already tight program.
- Limited access to comprehensive as-built service drawings made M&E coordination even more difficult. All existing services had to be protected and maintained as they served several businesses on the upper floors.
- Tanking concrete floors to the shower and kitchen proved difficult because of the amount of existing HVAC and electrical services, which had to be relocated.
 
Technologies
- The complete refurbishment and upgrade of internal finishes throughout the ground floor offices included the installation of Bene single glazed office partitions.
- The refurbishment also included the installation of state-of-the-art Eco FCU units complementing the heating and cooling arrangements for the new tenant.
- The scope of works included a complete new M&E installation. Part of this was a heating installation integrated with the existing system serving all five floors of the building. The output on each floor had to be tested and recorded prior to any works commencing. A controlled rebalancing of the system had to be carried out on completion to confirm the correct distribution of heat output to each floor.
- A new communications room was fitted-out to include fire suppression.

Successes
- The project was delivered within budget and on time, allowing the client to move in immediately.
- There were no reportable accidents.
- Based on ADCO’s attention to detail and excellent relationship with the client, ADCO have since completed other small works and upgrade projects for the client.